ROLEXROLEXROLEXROLEXROLEXROLEXROLEXROLEXROLEXROLEXROLEXROLEX
21 August 2008, 05:45 PM | #1 |
"TRF" Member
Join Date: Nov 2007
Real Name: Michael
Location: Melb, Australia
Watch: SS GMTIIC
Posts: 1,350
|
Jocke - My Current Bathroom Almost Completed!
IMG_0317.jpg
IMG_0318.jpg IMG_0319.jpg IMG_0320.jpg Jocke, Almost there. Could be another several weeks yet. The idiot that measured the template for the stone bench top stuffed up. There was only a 5mm overhang at the front whereas the Ensuite stone top was a 15mm overhang. It's not rocket science! They are getting a new stone bench top at their expense, but it could be a couple of weeks away. The bath and taps were fitted a couple of days ago. The shower screen and mirrors went in today. All the downlights etc have been fitted and it really lights the entire bathroom up. The little recess behind the toilet has small black granite feature tile 'sticks' and is lit up with its own little downlight too. I'll be bloody glad when it's all over. Apart from the issue with the stone bench top I cannot fault the work. The company expects very high standards from all the trades people. Those they don't measure up quickly are given the boot. Michael |
Currently Active Users Viewing This Thread: 1 (0 members and 1 guests) | |
Thread Tools | |
Display Modes | |
|
|
*Banners
Of The Month*
This space is provided to horological resources.